Project Portfolio

Geothermal Projects

Explore our portfolio of geothermal energy projects across Tanzania

60 MW

Natron Geothermal Prospect

Arusha Region

The Natron Geothermal Project is located in the Arusha Region, south of the Kenyan Rift within the Natron-Magadi Rift Basin. The prospect is currently at the reconnaissance study stage, with plans to advance it through detailed surface exploration to assess its geothermal potential. Following successful exploration and resource confirmation, the project is planned to progress through the subsequent phases of geothermal development, with a target of generating 60 MW of geothermal power.

View Details
5 MW

Luhoi Geothermal prospect

Pwani Region

The project is located in Rufiji District in Coast Region. A detailed surface study for this project was completed in June 2017 with technical support from the ICEIDA/Ministry of Foreign Affairs of Iceland. Currently, the project is under preparation to confirm the existence of the geothermal resources through a test drilling programme which will involve the drilling of three (3) slim wells and one (1) full-size well. Upon successful resource confirmation, the project will be advanced to subsequent development stages for geothermal power generation and direct-use applications

View Details
5 MW

Songwe geothermal prospect

Songwe

The Songwe Geothermal Project is another strategic project implemented by TGDC, located in Mbozi District, Songwe Region. A detailed surface study of the prospect was completed in September 2016 with support from UNEP/ARGeo, followed by additional surface investigations in 2018 in collaboration with the East African Geothermal Energy Facility (EAGER). The project is currently at the resource confirmation stage, with plans to drill three (3) slim wells and one (1) full-size well to verify the existence and viability of the geothermal resource. Upon successful resource confirmation, the project will be advanced through the conventional stages of geothermal development, culminating in the generation of 5 MW of geothermal power and the implementation of associated direct-use applications.

View Details
60 MW

Kiejo-Mbaka Geothermal Project

Mbeya Region

The Kiejo-Mbaka Geothermal Project is located in Rungwe District, Mbeya Region. A detailed surface study of the prospect was completed in June 2017 with technical support from the Icelandic International Development Agency (ICEIDA) under the Ministry for Foreign Affairs of Iceland. The project is currently at the preparatory stage for resource confirmation through a test drilling programme involving the drilling of three (3) slim wells and one (1) full-size well. Upon successful confirmation of the geothermal resource, the project will be developed to subsequent phases, with a target of generating 60 MW of geothermal power by 2030.

View Details
70 MW

Ngozi Geothermal Project

Mbeya Region

The Ngozi Geothermal Project is one of TGDC’s strategic flagship projects located in the Mbeya Region. A detailed surface study of the prospect was completed in September 2016 with support from UNEP/ARGeo. The project is currently in the resource confirmation phase which will involve drilling of three slim wells around the Ngozi Caldera. Upon successful confirmation of the geothermal resource, the project will be advanced to subsequent development stages, with a target of generating 70 MW of geothermal power by 2030.

View Details

Project Roadmap

Our strategic journey towards commercializing direct-use geothermal heat applications across Tanzania.

1

Preliminary Studies

Completed

Desktop and field-based screening to identify direct-use prospects in potential geothermal areas.

2

Market & Resource Assessment

In Progress

Detailed analysis of local economic activities and matching them with technical resource parameters.

3

Pilot Demonstrations

Planned

Establishing small-scale direct-use installations for greenhouse heating and grain drying.

4

Commercial Expansion

Future

Scaling up successful pilots into industrial-scale clusters with private sector participation.